Software Release
Scenario: A weekly release of a customer-facing web app, with a database migration included, moves from staging to production with a named rollback owner.
| # | Step | Owner | What happens |
|---|---|---|---|
| 1 | Cut the release candidate | Release manager | Tag the build, freeze the scope, and open a release ticket listing included changes, the migration, and the release class. Any change not on the list is pulled. |
| 2 | Confirm readiness evidence | QA lead | Attach the test run summary, open defect list and migration dry-run result to the ticket. Decision point: any open severity-one defect blocks the release; severity-two needs a written waiver from the product owner. |
| 3 | Approve for production | Engineering manager and product owner | Both approve the exact build identifier. If the migration is irreversible, the database owner also approves and states the restore point. |
| 4 | Deploy and watch | On-call engineer | Deploy during the agreed window, start the post-release watch list, and keep the rollback owner reachable. Record start and end times in the ticket. |
| 5 | Verify in production | QA lead | Run the smoke journeys: sign in, create an order, pay, and receive the confirmation. Decision point: any failure triggers the rollback step within the agreed time-box rather than a debate. |
| 6 | Roll back or close | Rollback owner | If rolling back, restore the previous build and the migration restore point, then log the reason. If closing, mark the ticket complete and send release notes to support. |
| 7 | Review the release | Release manager | Within the week, note what slipped, which gates were waived, and any SOP changes needed. Records kept: release ticket, approvals, test summary, verification results. |