Equipment Inspection
Scenario: A research lab shares one floor-standing centrifuge among eight researchers, and a faulty rotor could cause serious injury.
| # | Step | Owner | What happens |
|---|---|---|---|
| 1 | Check the tag and sticker | Researcher using the unit | Look for a lock-out tag and confirm the service sticker is in date. A tag or out-of-date sticker means do not use and tell the lab manager. |
| 2 | Inspect the rotor and bucket set | Researcher using the unit | Look for cracks, corrosion, pitting and missing bucket caps, and check that the rotor is the model on the load chart. Any visible damage ends the check. |
| 3 | Balance and load | Researcher using the unit | Weigh tubes to match opposite positions and keep within the load limit. If tubes cannot be balanced, prepare a water balance tube. |
| 4 | Run a short test | Researcher using the unit | Close the lid, start, and listen and watch for vibration over the first minute. Stop and escalate if there is excess noise or movement. |
| 5 | Log the use and any defect | Researcher using the unit | Write the date, rotor, runtime and any finding in the logbook. A defect is also reported to the lab manager the same day. |
| 6 | Decide on the defect | Lab manager | Tag the unit out, arrange repair and note the decision in the log. Units come back into use only after the manager signs the repair. |