Opening Procedure
Scenario: A mid-size contractor opens a site each day at 6:30 a.m. with a supervisor and a small crew on a multi-floor build.
| # | Step | Owner | What happens |
|---|---|---|---|
| 1 | Walk the perimeter | Site supervisor | Check fencing, gates and overnight damage and photograph anything out of place. Breaches are reported to the site manager before the gate opens. |
| 2 | Check utilities and hazards | Site supervisor | Confirm temporary power, water and lighting, and inspect excavations and scaffold tags. A missing or red tag stops work on that area. |
| 3 | Verify the crew and permits | Site supervisor | Match who is on site to the daily plan, confirm that work-at-height and hot-work permits are current. Unpermitted tasks are removed from the plan. |
| 4 | Hold the briefing | Site supervisor | Brief the crew on today's tasks, hazards and weather changes. Absent crew members are briefed on arrival and noted. |
| 5 | Decide to open | Site manager | Review the log and choose open, open with limits or hold. If any blocking item is unresolved, the site stays closed and the manager records why. |
| 6 | Sign and file the log | Site supervisor | Sign the opening log and send it to the manager. Logs missing by 7 a.m. are chased and noted in the weekly review. |