Three layers: instruction, procedure, system
Work instructions tell an operator how to run a station: settings, sequence, checks. Procedures cover cross-station processes such as changeover, material release or nonconformance handling. System-level procedures set how documents themselves are controlled and trained.
Keep the layers distinct. When a work instruction cites a setting range, it should point to the procedure that governs the range and not copy it, so a change in one place flows through.
Quality procedures need a disposition rule
The most important sentence in a nonconformance SOP is who may decide what happens to the material: use as is, rework, scrap, or return. Name the role, the limits of their authority and when a second signature is needed. Without that rule, floor supervisors improvise and records disagree.
Link each nonconformance to a corrective action so recurring defects lead to a procedure change, not just another form.
Maintenance and safety procedures
Preventive maintenance routines should name the equipment, interval, tools, safe state and the check before returning to service. The safe state is usually defined by an energy-control procedure; see the lockout/tagout template rather than restating it inside every routine.
For how production planning and floor procedures divide up, see the production department page and manufacturing.
Where SOPGalaxy fits
Use version history and diffs to see exactly what changed in a work instruction between revisions. Approval steps ensure engineering, quality and safety sign a change before it reaches the floor, and read receipts show which operators acknowledged the revision. Industry templates are described as included, so you can start from one rather than a blank page.